Gate 0 is the first gate in the 6-Gate Design Process. Its job is to make sure the AI has everything it needs before starting to design — by analysing your brief, identifying gaps, and filling them intelligently.

What Gate 0 does

  1. Parses your input — extracts the key design parameters from your prompt or uploaded brief document
  2. Identifies gaps — finds missing information that is essential for design (site area, number of units, target standard, budget, etc.)
  3. Makes reasonable assumptions — for non-critical gaps, applies sensible defaults based on building type and location
  4. Flags critical gaps — for information it cannot reasonably assume, it asks you directly
  5. Produces the Brief Summary — a structured record of all confirmed parameters

The Brief Summary

The Gate 0 output is a Brief Summary card containing:

FieldDescription
Project typeBuilding type and use class
ScaleGIA target, unit count, or key area
LocationSite address or region
Tenure / procurementOwnership model, procurement route
Quality targetBREEAM rating, EPC, Passivhaus, etc.
BudgetTotal or cost-per-m² if provided
Key constraintsPlanning, heritage, access, programme
Assumed valuesEverything the AI filled in (always shown explicitly)
Open questionsThings you still need to decide

Assumptions are always shown

Every assumption Gate 0 makes is listed explicitly in the Brief Summary. Nothing is hidden. If the AI assumed "residential mix: 60% 1-bed, 30% 2-bed, 10% 3-bed based on Bristol city plan policy", you will see that assumption and can change it.

Approving Gate 0

Review the Brief Summary and either:

  • Click Approve — the process moves to Gate 1
  • Click Edit on any field to change a value — the Brief Summary updates immediately
  • Type a correction in the chat: "Change the affordable tenure to 35% not 40%" — the Summary updates and shows the change

Once approved, the Brief Summary is saved as a Requirement node set in the Purple8 Graph and persists through all subsequent gates.

Example

Your prompt:

Design a 60-unit residential development in Bristol on a 0.4ha brownfield site.
Mixed tenure. BREEAM Excellent target.

Gate 0 output (Brief Summary):

FieldValueSource
Project typeResidential — Build to RentInferred
Units60Explicit
Site area0.4haExplicit
LocationBristol, UKExplicit
Mix50% 1-bed / 40% 2-bed / 10% 3-bedAssumed (Bristol city plan)
Affordable %35%Assumed (Bristol local plan policy)
QualityBREEAM ExcellentExplicit
EPCB minimumAssumed (BREEAM Excellent req.)
BudgetNot specified⚠️ Open question
ProgrammeNot specified⚠️ Open question
Ground floorTBC⚠️ Open question

The three open questions are presented to you. You can answer them, skip them (the AI will handle them at the relevant gate), or note them as TBD.